Understanding the intermittent bonded ribbon production line
Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. provides equipment for producing rollable formats used in optical-fiber manufacturing. Buyers can evaluate the capacity of this setup against their intended product range because it is designed for 12- and 16-fiber ribbons. Its split-type construction may also influence factory space and installation requirements.
Fiber Draw Tower Fiber Secondary Coating Line Fiber Secondary Coating Line
For this specific production line, the specified construction speed is 600 m/min. Fiber pay-off, gathering and guiding, intermittent resin dispensing, UV-LED curing, visual monitoring, capstan pulling, and take-up are integrated in the process. The full process is important to evaluate, not just the stated speed.
Factory utilities, reel requirements, available floor space, and installation conditions should be assessed before purchase. Request the supplier’s documentation package and verify that the system matches your cable design and operating needs. Early planning for these details can minimize setup delays and make startup smoother.
Key Takeaways
- Designed for rollable 12- and 16-fiber formats.
- Listed speed: 600 m/min for this equipment.
- Uses a split-type construction.
- Includes curing, monitoring, pulling, and take-up stages.
- Before purchasing, verify utilities, reels, installation requirements, and supplier documentation.
Intermittent Bonded Ribbon Production Line
Explore The Intermittent Bonded Ribbon Production Line
Three mold groups help shape rollable IBR formats by positioning fibers for small adhesive dots. Mold position is adjustable by operators from 0 to 15 mm, helping produce consistent spacing and form.
Produce Rollable Fiber Ribbons With Precision Bonding
The machine is fed by a 16-spool pay-off, and guide rollers with U-shaped grooves help maintain the organization of each strand. Steady contact during processing is encouraged by the rollers’ hard-anodized surfaces. For 12F and 16F layouts, the adjustable valve setup uses 5+5+1 valves for 12 fibers or 5+5+5 for 16. Confirm the appropriate tension control settings with the supplier for your cable design.
Support 12- And 16-Fiber Configurations At Speeds Up To 600 m/min
The stated construction speed reaches 600 m/min. The listed reel dimensions, Φ236 mm × Φ25.4 mm × 108 mm and Φ267 mm × Φ25.4 mm × 180 mm, correspond to pay-off reel options holding 25.2 km or 50.4 km of fiber. T-type and fiber-optic take-up reels are also offered for this system. Compare reel capacity with your production requirements and expected changeover time.
Review The Production Line’s Key Equipment And Controls
Tension, resin placement, and UV exposure must work together to maintain reliable output. The system helps operators match settings to their cable design and fiber ribbon requirements.
Manage Fiber Tension, Resin Dispensing, And UV-LED Curing Together
Electro-pneumatic adjustment is used for each pay-off unit. Through the interface, operators set adhesive-dot spacing and counts while dispensers work individually or in linked groups.
Before UV-LED post-curing, three pre-curing ovens work with the mold groups. Verify resin compatibility and operating conditions with the supplier.
Lamp current, oven temperature, alarms, and preset lengths are monitored or managed through the Siemens PLC and touchscreen. Before purchase, verify cabinet requirements and power supply needs.
| Stage | Specification | Buyer verification |
| Fiber tension | Pay-off tension: 0.4 to 2 N with ±0.02 N; capstan tension: 50 to 500 g with ±5 g accuracy | Match settings to cable needs |
| Resin dispensing | Individually operated or linked units with adjustable adhesive-dot spacing and count | Check interface configuration |
| Curing With UV-LED | Three 800 W pre-curing ovens; one 6 kW post-curing oven; 395 nm ± 3 nm; at least 85% cure under stable, high-speed conditions | Verify compatibility with the resin |
| Process monitoring | Siemens S7-1200 or S7-1500 PLC; 10.4-inch touchscreen; live lamp current and oven temperature, alarms, preset lengths | Check cabinet and power supply |
Plan Installation, Operating Conditions, And Line Configuration
Before the machine is delivered, prepare a dedicated operating area. An enclosed, clean, dry, draft-free space is needed for the optical fibre system. Keep the temperature from 15°C to 25°C, with humidity at or below 85%. These conditions help safeguard fiber equipment and maintain precision during operation.
With your facilities team, assess site utilities, available electrical capacity, cabinet space, and cable design. The system needs nitrogen supplied at 7 bar and 99.99% purity, together with compressed air at 6 bar. The electrical supply must be three-phase, five-wire, and 380 V ±10%.
- Reserve room for the cabinet, components, resin, and access to service parts. Before starting the line, check the temperature settings and tension control.
- Plan around the specified reel dimensions of Φ410 mm × Φ50.8 mm × 391 mm. Reels of up to 30 kg can be handled by the take-up unit.
- Account for the main power feed-in cable when preparing the site. Connection cables and cable trays are not included with the equipment.
Before ordering, confirm the supply scope, reel types, and installation requirements. Reviewing these items may reduce setup time and avoid subsequent delays. Ask the supplier to verify settings for your fiber and cable design, including lamp accuracy and operating conditions. A clear plan helps the production system start more smoothly.
Request Pricing For A Ribbon Production Solution Tailored To Your Needs
At its stated speed of 600 m/min, this line can be assessed by manufacturers producing rollable 12- or 16-fiber formats. Share details of your fiber layout, output targets, cable requirements, reel preferences, and factory conditions to obtain a quotation.
Check the proposed system for its 16-spool pay-off, UV-LED curing setup, take-up capacity, and available options. Examine the included components, dispensing-head options, unit functions, and cable design prior to ordering.
Listed documents include operating and maintenance manuals, a general layout drawing, electrical schematics, and a wear-parts list. These documents can help understand setup time and ongoing service needs.
Contact Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. to obtain pricing and configuration details that suit your output plan and site utilities. Verify the supply scope and replacement parts before purchase.